Automation Solutions

Contract manufacturers and OEMs trust Haumiller to deliver quality automated assembly machines for high-volume disposable products.
Haumiller equipment is production-ready faster, more efficient, reliable, and often exceeds 95% OEE.

Overcapper

Haumiller's 4200 and 4400 Overcapper Machines, embodying engineering excellence in continuous motion assembly, offer quick setups, reduced installation costs, and maximized efficiency for diverse cap assembly needs, achieving up to 450 parts per minute.

Reduced installation costs and quick setups are achieved through conveyor and guaranteed change parts. Haumiller offers the proven industry-leading experience in continuous motion assembly, with over 250 different caps assembled using our continuous motion assembly machines. Our high speed assembly and assembly automation expertise ensure custom automation solutions that embody engineering excellence. Benefits include reduced operating and installation costs, expedient delivery, and maximum efficiency delivered by our high speed continuous motion technology to produce the best results in automation and engineering.

Haumiller 4200 Overcapper Machine

The Haumiller 4200 Overcapper is a 6-pocket continuous motion machine built from the same base machine as the 3250 Spray Tip Applicator Machine.

  • Can handling done with quick-disconnect, anti-static can guides and star wheels.
  • Comes with a safety enclosure with interlocks.
  • Maximum 180 parts per minute.

Haumiller 4400 Overcapper Machine

The Haumiller 4400 Overcapper is a 12-pocket continuous motion machine built from the same base machine as a 3400 Machine.

  • Rotary can track with infeed and outfeed powered star wheels.
  • Can handling is done with quick-disconnect, anti-static can guides and star wheels.
  • Comes with a safety enclosure with interlocks.
  • Maximum 450 parts per minute.

Our Testing Process Simplified

Our testing team isn't trying to make the machine work, it's trying to make the machine fail. We assess the durability of every machine to ensure your machine will last with any operator under any condition.

Phase 1

A series of short tests of every separate function of the machine to find obvious errors while running only the specific parts, and is completed when each function of the machine has run approximately 10 seconds.

Phase 2

Phase 2 is a series of tests, operating the machine as a whole interactive system. It is completed when the machine has run approximately 5 consecutive minutes with every function working.

Phase 3

A test of each specified set of parts, with every function working and the machine operating as a complete, interactive system. This phase is considered complete when the machine has run satisfactorily for 30 consecutive minutes unless a different time frame is specified.

The most common questions

What makes you confident in achieving a significantly higher output rate for the machine?
Do you take any project?
Who will install my equipment? 
When is the best time to engage Haumiller?
When can I expect a response to my request for service / info?

We go Above and Beyond to Understand Clients' Unique Needs, Providing Solutions That are Tailored to Their Goals

Join Our Team

We Believe in the Power of Teamwork and Collaboration