Automation Solutions

Contract manufacturers and OEMs trust Haumiller to deliver quality automated assembly machines for high-volume disposable products.
Haumiller equipment is production-ready faster, more efficient, reliable, and often exceeds 95% OEE.

Spare Parts

Haumiller Engineering is your go-to provider for high-quality, competitively priced spare parts for continuous motion assembly machines, offering in-house machining, 24/7 capacity, and expert custom automation solutions.

Reliable Parts for High-Speed Assembly Machines

When precision, speed, and efficiency are critical to your continuous motion assembly systems, Haumiller Engineering delivers. As a trusted spare parts provider, we offer high-quality components at competitive prices, ensuring minimal downtime for your automation systems.

Our onsite machining department operates with:

  • Eight CNC machining centers.
  • 25 skilled machinists.
  • Two production shifts for faster turnaround.

If you need a part quickly, our custom automation approach ensures rapid production and delivery to keep your assembly machines running smoothly.

Why Choose Haumiller for Spare Parts?

  • In-house machining tailored for continuous motion & high-speed assembly systems.
  • 24-hour-per-day capacity to support urgent part needs.
  • Expert knowledge of every machine component (we designed them!)
  • Up-to-date documentation & consulting to address parts prone to wear or breakage.
  • Rigorous quality checks for precise measurements and long-term reliability.

A Process Built for Performance

At Haumiller, our approach ensures seamless integration with your assembly automation systems:
Design > Build > Integrate > Consult

Our Testing Process Simplified

Our testing team isn't trying to make the machine work, it's trying to make the machine fail. We assess the durability of every machine to ensure your machine will last with any operator under any condition.

Phase 1

A series of short tests of every separate function of the machine to find obvious errors while running only the specific parts, and is completed when each function of the machine has run approximately 10 seconds.

Phase 2

Phase 2 is a series of tests, operating the machine as a whole interactive system. It is completed when the machine has run approximately 5 consecutive minutes with every function working.

Phase 3

A test of each specified set of parts, with every function working and the machine operating as a complete, interactive system. This phase is considered complete when the machine has run satisfactorily for 30 consecutive minutes unless a different time frame is specified.

The most common questions

What makes you confident in achieving a significantly higher output rate for the machine?
Do you take any project?
Who will install my equipment? 
When is the best time to engage Haumiller?
When can I expect a response to my request for service / info?

We go above and beyond to understand clients' unique needs, providing solutions that are tailored to their goals.

Join Our Team

We believe in the power of teamwork and collaboration.